Subfloor first
Flatness checked with a straightedge and corrected with levelling compound or sanding — not hidden under thicker underlay.
Hardwood, engineered, laminate, luxury vinyl and tile — installed over a subfloor that's been checked, not assumed.
Most flooring complaints — hollow spots, squeaks, cupping, cracked grout lines — trace back to the subfloor, the moisture content or the expansion gap, not the product.
We check subfloor flatness and moisture before anything is opened, let material acclimatise, and install to the manufacturer's spec so the warranty actually stands.
Flatness checked with a straightedge and corrected with levelling compound or sanding — not hidden under thicker underlay.
Concrete slabs tested before glue-down or floating installs. Skipping this is how a basement floor cups six months later.
Runs set out from the sightline that matters, so you don't end up with a sliver rip at the room's focal wall.
Proper uncoupling or backer where it's called for, consistent joint width, and grout colour agreed before the bag opens.
Tenant improvements and common-area refits, scheduled around an operating business — evenings and weekends where the space can't close.
We walk the property with you — grades, drainage, access, what you actually use the space for. No guesswork from a satellite photo.
A layout, material selections and a transparent line-by-line price. You see what you're paying for before anything is ordered.
Hamilton driveway approvals, building permits, conservation authority and heritage approvals — we confirm what your address needs and handle the application.
Base prep done properly, a crew that cleans up daily, and a walkthrough at the end where we go over maintenance and stand behind the work.
Sometimes — floating floors can go over sound, flat, well-bonded tile or vinyl. We check condition and height at door openings first.
Typically 48–72 hours in the room it's going into, with the heat on. Manufacturer spec wins where it differs.
Yes. Below grade we steer toward vinyl plank or tile over a moisture barrier rather than solid hardwood, for reasons that show up in year two.
Yes, quoted as part of the job. Anything fragile or high-value is better handled by you.
Superior Landscaping Design Construction recently completed a driveway extension for us and also refinished the existing interlock, leveling it out beautifully. They topped everything off with a sealer coat, and the end result looks fantastic. The price was reasonable, the workmanship was solid, and the team was great to work with. I highly recommend them if you're looking for quality landscaping and driveway work done right.
A fantastic job done by Ahmed and his crew. Extremely punctual, left no mess and paid attention to all details of driveway, walkway and porch. All employees were friendly and a pleasure to deal with. I highly recommend them.
I had an excellent experience with Superior - Landscaping | Design | Construction for my exposed aggregate concrete driveway. Ahmed and his team were fantastic to work with—friendly, professional, and highly skilled. They stuck to the timeline and delivered everything as promised. The quality of their work was outstanding, with a flawless finish. I'm extremely happy with the results and would highly recommend them to anyone looking for top-notch service and craftsmanship!
Reviews are reproduced word for word from our Google Business profile.
Driveways, patios, walkways, steps, pads and paving restoration — poured, finished and cured to survive Hamilton winters.
Garden designGarden design, planting, sod and lawn care — plus the grading, soil and drainage work that decides whether any of it survives.
InterlockInterlock patios, walkways, driveways, retaining walls and fire features — built on a base that won't move.
Tell us what you're planning and we'll come look at it. Call, text or WhatsApp — whatever's easiest.